Four states of one screen. Everything here is fictional: the company, the site, the people, the recording.
state 1 · a recording dropped in
Dictation desk Lachance Mécanique du bâtiment
Received›Transcribed›Laid out›Checked›Delivered
1Recording
2Output
3Document
New dictation
Drop a voice recording from your phone or recorder. A voice memo straight from the site is fine. It stays private to your office.
MP3
visite-14-principale.mp311 min 32 s · 18.4 MB · recorded today 10:14 · French detected
Ready
mp3 · m4a · wav · voice memos · up to 3 hours
Or record hereRecording needs a microphone and nothing else. Nothing is sent until you press Continue.
Copy notes. "Dictation desk" follows the family (transaction desk, enquiry desk). The first screen has one job and one primary button. The language is detected, never asked. The "Layouts you use" list is the hook for repeat work: next time, step 2 is already answered.
state 2 · an example of the output dropped in · a different business, a different subject
Dictation desk Lachance Mécanique du bâtiment
Received›Transcribed›Laid out›Checked›Delivered
✓Recording
2Output
3Document
What should the document look like?
Drop a document whose look you want: one you already send, or one you simply like, about anything. We keep its layout, its headings and its tone, and fill it from the recording. Your name replaces theirs.
PDF
Client meeting summary — Beaumont Advisory.pdf1 page, letter · a consultancy's summary of a bakery meeting · nothing to do with heating, and that is fine
Read
the example, as dropped
B
Beaumont AdvisoryManagement consultants
1200 rue de la Gauchetière O., bureau 410 Montréal QC H3B 4W5 +1 514 555 0147 · beaumontadvisory.example
Client meeting summaryRef. BA-2026-0387
Second-shop expansion: kick-off meeting
Client
Maison Lévesque, artisan bakery
Date
14 May 2026, 09:30
Location
Beaumont offices, room 4
Duration
50 minutes
Attendees
Camille Lévesque (owner), Hugo Lévesque (operations), Daniel Beaumont, Sofia Marchetti (Beaumont Advisory)
Prepared by
Sofia Marchetti, senior consultant
1. Purpose
To agree the scope and timeline of the review before the second shop opens in September: staffing model, opening inventory, and which processes from the first shop carry over unchanged.
2. Discussion
Topic
Summary
Status
Staffing model
The first shop runs on four full-time bakers and two counter staff. Camille wants the second shop to open with three bakers and share the night shift.
To validate
Opening inventory
Hugo estimates three weeks of dry goods at opening; the supplier can deliver twice weekly after that.
Agreed
Point of sale
Both shops on the same system; the second shop's catalogue imported from the first with location-specific pricing.
Agreed
Lease and fit-out
Fit-out dates depend on the landlord's permit. Not in our scope, but the opening date depends on it.
Risk
3. Agreed actions
#
Action
Owner
Due
1
Send the signed engagement letter and the first invoice
Beaumont
16 May
2
Share last twelve months of sales by hour from the first shop
Hugo Lévesque
21 May
3
Confirm the landlord's permit date
Camille Lévesque
28 May
4
Draft staffing model with three scenarios
Sofia Marchetti
6 June
4. Key figures
Item
Value
Note
Engagement budget
$18,500
Fixed fee, two phases
Target opening
12 Sep 2026
Subject to the permit
Opening inventory
3 weeks
Dry goods only
5. Next meeting
Thursday 11 June, 09:30, at the first shop, to review the staffing scenarios with the head baker present.
6. Approval
Sofia MarchettiBeaumont Advisory
Camille LévesqueMaison Lévesque
What we read in it
—Letterhead logo, name, address, copper rule
—Title and reference serif, navy
—Details block client, date, location, attendees
01Purpose one paragraph
02Discussion table: topic, summary, status
03Agreed actions table: action, owner, due
04Key figures table with a note
05Next meeting one line
06Approval two signatures
Tone: formal, third person, short sentences. Navy headings, copper rule, numbered sections, status words in the tables. Your letterhead replaces theirs.
Or start from a layout
Site visit reportMeeting minutesQuote notesWork orderPlain transcript
As recordedEnglishFrench
About a minute for ten minutes of audio.
Design notes. The example is deliberately about something else, a consultancy's summary of a bakery meeting, so the point lands: the look and the structure come from the document, the content comes from the recording. The read-back on the right (seven parts, the tone, the accent) is the trust moment before anything is transcribed. The full sample is at example.html.
state 3 · transcribing, the document filling as it goes
Dictation desk Lachance Mécanique du bâtiment
Received›Transcribing›Laid out›Checked›Delivered
✓Recording
✓Output
3Document
Listening
04:10 of 11:32. You can leave this page; the document will be waiting under Recent.
Transcript livetap a sentence to hear it
TechnicianSite visit at fourteen Principale, Tuesday morning. Met with Mr Dubé, the building manager.
TechnicianReason for the visit: the second floor has been too warm since last week, mainly the offices on the west side.
Site contactIt started Thursday, the thermostat says twenty-six and it never comes down after lunch.
TechnicianOn the roof, unit two. Condenser fan runs, but the belt on the supply fan is glazed and slipping, you can hear it on start-up.
TechnicianSupply air thirteen degrees, return twenty-four. Static pressure zero point eight inches. Compressor draws fourteen point two amps, nameplate says sixteen.
TechnicianFilters are past due, the coil is dusty on the north face.
TechnicianRecommend we replace the belt, an A forty-two, clean the coil and quote a new contactor because the…
This transcript is a receipt that the recording is being heard. The audio stays the record, and you can correct any sentence before the document goes out.
Beaumont summary layout filling from the recording
Details block
1. Purpose
2. Observations · 2 rows so far
3. Agreed actions · listening
4. Key figures · 4 found
5. Next visit
6. Approval
Design notes. Two things move at once: the sentences arriving on the left and the report's sections lighting up on the right. That pairing is the whole product in one picture, and the shot the film should be built around. One word carries a dotted "unsure" underline so the honesty is visible before the result screen.
state 4 · the document in the client's own layout
Dictation desk Lachance Mécanique du bâtiment
Received›Transcribed›Laid out›Checking›Delivered
✓Recording
✓Output
3Document
Site visit recap
Written from the recording, in the Beaumont layout and tone, on your letterhead. Click any paragraph to hear the sentence it came from.
−10 s+10 s
TechOn the roof, unit two. Condenser fan runs, but the belt on the supply fan is glazed and slipping, you can hear it on start-up.
TechSupply air thirteen degrees, return twenty-four. Static pressure zero point eight inches. Compressor draws fourteen point two amps, nameplate says sixteen.
TechFilters are past due, the coil is dusty on the north face.
TechRecommend we replace the belt, an A42, clean the coil and quote a new contactor because the contacts are pitted.corrected
ContactCan you come back once the parts are in? We have the inspection on the twentieth.
The recording stays attached to the report. A corrected sentence keeps the original underneath it.
L
Lachance Mécanique du bâtimentHeating · ventilation · service contracts
M. Lachance (technician), Mr Dubé (building manager)
Prepared by
M. Lachance, from the recording
1. Purpose from 00:19
The second floor has been too warm since Thursday last week, mainly the west-side offices. The thermostat reads 26 °C and does not come down after lunch.
2. Observations 00:41 · 03:30
Item
Summary
Status
Complaint
"It started Thursday, the thermostat says twenty-six and it never comes down after lunch."
Confirmed
RTU-2 supply fan
Belt glazed and slipping, audible on start-up. Condenser fan running normally.
Needs work
Filters
Past their change date.
Past due
Condenser coil
Coil dusty on the north face.
To clean
3. Agreed actions 04:02 · 05:48
#
Action
Owner
Due
1
Replace the supply-fan belt (A42)
M. Lachance
Return visit
2
Clean the condenser coil
M. Lachance
Return visit
3
Quote a replacement contactor; the contacts are pitted
Office
This week
4
Return visit once the parts are in
M. Lachance
date not said
4. Key figures 02:14
Reading
Value
Note
Supply air temperature
13 °C
Return air 24 °C
Static pressure
0.8 in. w.c.
Compressor current
14.2 A
Nameplate 16 A
5. Next visit 05:48
Once the parts are in, and before the client's inspection on the 20th. date not said in the recording
6. Approval
M. LachanceLachance Mécanique du bâtiment
Mr DubéBuilding manager
Nothing leaves until you choose.
Design notes. The output keeps the consultancy's letterhead structure, navy headings, copper rule, numbered sections and three tables, with Lachance's own letterhead and the HVAC visit as the content. Each heading carries the time it came from, so the report is checkable against the audio in seconds, not by listening to eleven minutes. The one thing not said gets a visible gap, not a guess. "Nothing leaves until you choose" is the human-approval line the whole NCS family uses.
MP3
Drop a recording here
from your phone, a voice memo, a call
mp3 · m4a · wav · up to 3 hours · it stays private to your office
MP3
Release to add the recording
visite-14-principale.mp3
PDF
Drop a document whose look you want
one you already send, or one you simply like
pdf · docx · we keep its layout, headings and tone